Relocation of a
bestehenden
Gasleitung
To integrate a new culvert

Careful planning was required: special traffic regulations had to be organised in advance. In addition, the construction and subsequent dismantling of storage and assembly areas had to be carried out on fields with a total area of around 6,000 m2.

Project manager: André Prytamannyi, Augel
Client: Ludwig Freytag GmbH
Place of execution: Kasbach-Ohlenberg
Team: 3 People
Execution time: November 2020 – January 2021

An eye-catching feature of this construction project was the flushing collection basin measuring 7.30 x 7.30 x 1.0 metres, which had to be constructed, maintained and dismantled.