Scroll
Zukunftsorientierte Komplettlösungen
New construction
of a separator system
for hydropower plants
RWE Power
Pipeline Construction
New construction
of a separator system
for hydropower plants
RWE Power
Services
New construction
of a separator system
for hydropower plants
RWE Power
Services
New construction
of a separator system
for hydropower plants
RWE Power
Careers
New construction
of a separator system
for hydropower plants
RWE Power
Responsible
New construction
of a separator system
for hydropower plants
RWE Power
Bauen im sensiblen Industrie Bestand
New construction
of a separator system
for hydropower plants
RWE Power
Bauen im sensiblen Industrie Bestand
New construction
of a separator system
for hydropower plants
RWE Power
German Brand Award 21 special
New construction
of a separator system
for hydropower plants
RWE Power

During the summer, Augel installed three new separator systems underneath the historic art nouveau power plant in Heimbach-Schwammenauel on behalf of RWE Power.

Projektleiter: Dirk Schmitt Augel
Bauherr: RWE Power
Ort der Ausführung: Heimbach-Schwammenauel
Ausführungszeit: Sommer 2012
Mannschaft: 3 People

The power plant is located in a nature and water conservation area, which is why Augel worked in accordance with the highest WHG standards - for us, as a certified WHG specialist company, not a problem at all!

Titel
Chronology
Of the Project
Augel-2020-089-RMR-Vörde
Building site equipment

Clearance of construction site

Excavation of the pits in line with the profile for installation of the separator components at the correct height

Augel-2020-089-RMR-Vörde
Entwässerung Rohre

Insertion of the vessels

Pipe laying and connection work

Filling the construction pit with compactable material

Augel-2020-089-RMR-Vörde
Abscheideranlage

Fixing of the shaft structures by means of plates

Restoration of the construction site

Andecken des Covering the topsoil and sowing grass seeds

Augel-2020-089-RMR-Vörde