Scroll
Zukunftsorientierte Komplettlösungen
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Pipeline Construction
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Services
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Services
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Careers
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Responsible
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Bauen im sensiblen Industrie Bestand
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
Bauen im sensiblen Industrie Bestand
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert
German Brand Award 21 special
Relocation of a
bestehenden
Gasleitung
To integrate a new culvert

Careful planning was required: special traffic regulations had to be organised in advance. In addition, the construction and subsequent dismantling of storage and assembly areas had to be carried out on fields with a total area of around 6,000 m2.

Project manager: André Prytamannyi, Augel
Client: Ludwig Freytag GmbH
Place of execution: Kasbach-Ohlenberg
Team: 3 People
Execution time: November 2020 – January 2021

An eye-catching feature of this construction project was the flushing collection basin measuring 7.30 x 7.30 x 1.0 metres, which had to be constructed, maintained and dismantled.

Titel
Chronology
Of the Project
Augel-2020-089-RMR-Vörde
Traffic order

Traffic order for diversion and closure of agricultural roads

Augel-2020-089-RMR-Vörde
Construction of site roads:

Construction of site roads:
Access roads and driveways up to a thickness of 75 cm with gravel base course

Augel-2020-089-RMR-Vörde
sanitary facilities

Supply of sanitary facilities including electricity and drinking water

Augel-2020-089-RMR-Vörde
Exposure of existing pipeline

Exposure of existing pipeline to integrate a new culvert

Augel-2020-089-RMR-Vörde
Exposure of existing pipeline

Deconstruction of the construction roads, as well as the storage and assembly areas in fields

Augel-2020-089-RMR-Vörde