Scroll
Zukunftsorientierte Komplettlösungen
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Pipeline Construction
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Services
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Services
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Careers
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Responsible
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Bauen im sensiblen Industrie Bestand
Pipeline
Maintenance
RMR railway crossing Betuwe Line
Bauen im sensiblen Industrie Bestand
Pipeline
Maintenance
RMR railway crossing Betuwe Line
German Brand Award 21 special
Pipeline
Maintenance
RMR railway crossing Betuwe Line

In spring 2020, the Rhein-Main-Rohrleitungstransportgesellschaft commissioned AUGEL to replace the DN 600 pipeline under a railway crossing. The measure came about because Deutsche Bahn plans to build an additional track in this section. A particular challenge for us in this construction project was the fact that the work in the railway body was to be completed within a 10-day shutdown period (1 May - 10 May 2020).
For AUGEL and contractors it was therefore 24/7 shift operation!

Projektleiter: Marcel Kirchesch, Augel
Bauherr: Rhein-Main-Rohrleitungstransportgesellschaft
Ort der Ausführung: Voerde, Niederrhein (Kreis Wesel)
Mannschaft: 8 - 15 People
Ausführungszeit: 06.04.-22.05.2020
Partner: Ludwig Freytag, Ingenieurbüro Stein, Pipeoline

Within these 10 days, the tracks were dismantled, the pipeline exposed, and cuttings were made. The old, 32 meter long DN 600 pipeline was removed, and a new section was laid and welded. After successful tests using X-rays and ultrasound, the deconstruction work could begin.

24h365

Thanks to the exemplary schedule, the work was completed one day ahead of schedule and the tracks were handed over to DB.

Titel
Chronology
Of the Project
Augel-2020-089-RMR-Vörde
Line information

Line information (by AUGEL) with BIL

Approval procedure (Obtaining various permits from different authorities)

Stocktaking by means of 3D scanner including georeferencing of the measurement points

Augel-2020-089-RMR-Vörde
Dokumentarische Sicherung

Search pit for the pipeline

Augel-2020-089-RMR-Vörde
Uncovering

Uncovering of 32 meters of pipeline (DN600)
day and night shift

Augel-2020-089-RMR-Vörde
Separating Cut

Separating Cut Maintenance

Augel-2020-089-RMR-Vörde
Pipework

Pipework (Ausbauen der alten Pipeline mit anschließendem Einbauen und Verschweißen des neu gelieferten Pipelinerohrs inkl. PE & GFK Umhüllungsarbeiten)

Augel-2020-089-RMR-Vörde
Prüfungen

Non-destructive testing::
Ultrasound and X-ray inspection

Approval by client

Augel-2020-089-RMR-Vörde
Prüfungen

Deconstruction of the pipe trench

Backfilling of the trench by means of mobile conveyor belt (Telebelt)

Augel-2020-089-RMR-Vörde
Prüfungen

Compaction tests through load plate compression tests

Restoring the track body

BE Areas Deconstruction

Topsoil cover-up

Augel-2020-089-RMR-Vörde

WHAT THE CLIENT SAYS

"I would like to take this opportunity to thank the AUGEL team and their subcontractors. All of them have contributed to the punctual and accident-free completion of the construction site under the difficult boundary conditions of the German Railway's track possessions closure. The work was excellently prepared and everyone pulled together. No one thought they were too good for weekend, holiday or night work."