Scroll
Zukunftsorientierte Komplettlösungen
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Pipeline Construction
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Services
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Services
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Careers
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Responsible
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Bauen im sensiblen Industrie Bestand
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
Bauen im sensiblen Industrie Bestand
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline
German Brand Award 21 special
Relocation of a
DN300 gas pipeline
Trans-Europa-Naturgas-Pipeline

In the Eifel region, Augel has been carrying out various civil engineering works on behalf of TENP since the end of April 2020. A major part of the construction project is the relocation of a DN300 gas pipeline in Auderath. For this purpose various measures around the pipe construction are carried out. Old PE-coatings are removed and various separation cuts are made. Then the pipeline route is adapted, followed by welding work in accordance with DVGW GW350 with subsequent PE re-coating of the welded seams on bare pipe sections and pipe bends.

Projektleiter: André Prytamannyi, Augel
Bauherr: Trans-Europa-Naturgas-Pipeline
Ort der Ausführung: Auderath
Mannschaft: 3 People
Ausführungszeit: Start of construction work April 30, 2020 (construction work still in progress)
Partner: PlannIng GmbH

Another special highlight is the use of our ultra-modern 3D scanner including georeferencing of the measuring points for the purpose of measurement and stock-taking after pipe construction work.

Titel
Chronology
Of the Project
Augel-2020-089-RMR-Vörde
Building site equipment

Building site equipment

Opening and taking up the unbound fastening

Preparation of the excavation pit using suction dredgers and large excavators

Augel-2020-089-RMR-Vörde
Entwässerung Rohre

Search pit for the pipeline

Excavation and subsequent manual shafting near the pipeline

Moving the excavated material due to limited storage space

Augel-2020-089-RMR-Vörde
Abscheideranlage

Installation of the site stairs and site protection

Measurements by means of 3D scanner

Georeferencing of the measurement points

Augel-2020-089-RMR-Vörde